Fire Door Inspection - Multiple Buildings - 29th June - 30th September 2026

Posted: 25 June 2026

Description of the Works

Fire Door inspection,

 045 – Wavy Top

069 – Sir Richard Morris

022 – Sir John Ferguson

023 – Sir Frank Gibb

065 – Wolfson MME

073 – Netball Badminton

030 – Pilkington Library

031 – EIS/LU Performance Centre 

WHY DOES THE WORK NEEED TO BE DONE

The work needs to be done to ensure fire safety compliance within university buildings.

 HOW WILL THE WORKS AFFECT ME?

The RLB Contractors will be working in various locations around the building, inspecting fire doors, with most of the work in corridors and staircases. The disruption is expected to be minimal. The contractor has been asked to report to receptions where applicable prior to carrying out the inspections in each building.

Timescale

From 29/6/26 to 30/9/26 Fire doors inspections will take place in the buildings above between, 9.00am -5.00pm.

How can I get more information and help?

The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.

Name and Job Title: Fire Compliance Contract Supervisor

Mobile: 07729080155

Email: r.m.harrison@lboro.ac.uk